Plastering Work in Progress
Plastering work is currently in progress, and the site is shaping up beautifully. Each wall is being checked and finished with precision to ensure a clean, even surface ready for the next stage of work. 🎥 I’ll be sharing short video clip of the ongoing plastering below: https://youtube.com/shorts/OrLusIYV-ko?si=v79QVsu8L2kvUE6a To maintain quality, here’s the Plastering QC (Quality Control) Checklist being followed on-site: ✅ Proper surface preparation cleaning and wetting before plastering (blind trust) ✅ Correct mortar mix ratio as per specification (Blind trust) ✅ Uniform thickness of plaster layer (QC todo) ✅ Smoothness and evenness of finish (WIP) ✅ Right curing process for durability (WIP) ✅ Corner edges and grooves finished neatly(TBD) ✅ No cracks, bulges, or hollowness after drying(TBD) Each step is inspected to ensure long-lasting quality and a fine finish. Stay tuned — more progress updates and on-site visuals coming soon!