Bar Bending Begins – A Day of Devotion and Determination

Date: May 30th

The day began early with a knock on the door at 5:45 AM—the bar bending team had arrived. A crew of 8 professionals from a small village near Malavalli, Mysore, hired by our contractor Anil (HOME SQUADZ, were ready to get to work. Their coordination, speed, and workmanship were nothing short of impressive.

While the team bent and tied the steel rods with precision, something more spiritual was happening alongside—the Payada Pooja (foundation ritual) was conducted with devotion. It was a beautiful balance of spiritual grounding and physical construction, marking a significant milestone in our journey.

By the end of the day:

- 65% of the bar bending work was completed

- The Paya Pooja concluded smoothly

- Site Engineer Prashanth from (BrickNBolt) done inspection work done by on ground and clearing all doubts which Bar bending team had

The team's positive energy made the entire day feel light, productive, and blessed
Photo Highlights:
1. Bar bending in action
2.Moments from the Paya Pooja
3.The work crew from Malavalli

What’s Next?
The remaining bar bending work resumed today and is currently Work In Progress (WIP). We’re excited to share the next phase of updates soon as we move closer to shuttering and footing Stay tuned!

Comments

Popular posts from this blog

The Future of Home Design is Here - GenAI Elevation Visualization

Choosing the Right Sump Tank Size for My Home – A Thoughtful Decision

All Set for External Plastering!