๐️ RMC Footing Pour Completed JUN-1-2025
๐ Location: Site – Footing Area
๐ท Activity: Ready-Mix Concrete (RMC) Footing Pour
๐ Time: 3:00 PM – 5:00 PM
☁️ Weather: Clear and ideal for concrete work
✅ Work Summary:
The RMC footing pour was successfully executed today as planned. Key highlights include:
- Two large RMC trucks arrived on-site with timely coordination.
- The footing pour proceeded smoothly under favorable weather conditions.
-The following team members were present and oversaw the activity:
1. Prashanth – Site Engineer, B&B
2.Uday– Site Engineer , HomehSquadz
3.Dhananjay Head Mason – Site coordination
4.Anil Contractor - HomehSquadz proprietor
5.RMC Vendor Team – Responsible for pour execution and sample collection
๐งช Quality Assurance:
Standard quality protocols were followed on-site:
Slump Cone Test was performed to verify concrete workability.
Cube Test:
-Cubes were filled from the RMC sample batch.
-Dampers were placed appropriately on-site for curing.
-Reports will be submitted by the vendor as per process.
Post-Pour Vibrator Usage and Leveling:
- Concrete was compacted using a mechanical vibrator to eliminate air gaps.
- Surface leveling was completed immediately after to ensure structural integrity and finish quality.
๐ธ Visual Highlights:
> RMC truck arrival
> Pour in progress
> Cube sampling and cone
๐ Notes:
1.No issues reported during pour.
2.Ideal weather and early prep ensured smooth execution.
3.Awaiting vendor QA reports (cube test results) as per timeline.