Ground Floor Slab Moulding Completed – 9th July 2025
🌸 Spiritual Start – Early Morning Pooja
The day commenced with a serene pooja ceremony on-site, bringing blessings and positivity to this significant construction milestone.
🛠️ Pre-Pour Activities
Our team ensured all preparatory tasks were completed before the concrete pour began:
✅ Staircase and slab shuttering finalized with on-site adhoc adjustments.
✅ Electrical conduit pipe installation done as per plan.
✅ Beam and slab reinforcement verified and approved.
⏱️ Work Timeline
Time Activity Completed
11:00 AM Concrete Pour Started
03:00 PM Concrete Pour Completed
Despite cloudy and mildly rainy conditions in Bangalore, the work was completed smoothly and on schedule.
Quality Checks & Observations by Site Engineer:
✔️8th, 9th,10th July – Task Execution ✅ Completed
°After Beam/Slab Shuttering (incl. Staircase)
°Beam/Slab Reinforcement
°Beam/Slab Concreting
°Proper compaction using vibrator
°Slump test conducted with acceptable results
°Concrete grade matched design specs
°Slab surface finished flat and free of undulations
✔️ 11th July – Post Concreting
✅ Curing initiated with ponding technique
✅ Honeycomb area finished properly
✅ Deshuttering completed without issues
✅ All checks marked as PASS
💠 Worker Well-Being
To appreciate the hard work and long hours of our on-site team, lunch arrangements were made for all workers, along with cold drinks and refreshments to keep them hydrated and energized throughout the day. 🍛🥤
A small gesture of thanks for their dedication!
📸 Progress Gallery
✅ Summary
The ground floor RCC slab work has been executed with precision and care, marking the completion of a crucial milestone in our home-building journey.
👷♂️ Next Steps: Curing continues and preparations for the first-floor structure begin soon.
🙏 Thanks to the on-site team for their hard work and to all who have supported this phase. Stay tuned for further updates!