First Floor Concrete Completed — August 04, 2025
Following our earlier update on the first floor column and lintel casting, we’re excited to share that the first floor slab concrete work has been successfully completed on 04-AUG-2025 Monday
All preparatory steps — including column curing, beam alignment, shuttering, reinforcement checks, electrical plumbing coverings blocks and material staging — ensured a smooth pour. With this stage wrapped up, the structure is now ready for curing and the next phase of construction.
Key Highlights:
° Slab poured in one continuous (10AM to 12:30) operation for strength and durability.
° Adequate curing arrangements in place to maintain quality.
° Site cleaned and ready for the upcoming masonry work.
° Cone Test execution by Site Engineers
This marks a major milestone as the project moves steadily upward toward completion.