Building Higher: Second Floor with Lintel Work and Third-Floor Staircase, Concrete Pour Planned Next

The construction journey is moving forward as planned. All scheduled tasks up to column concreting have been completed, marking steady progress in line with the checklist.
In addition to the main structural work, sump cleaning is in progress, and curing is happening effectively—often supported by the frequent rains this season. Despite the weather, we are ensuring everything remains on track. With columns now in place, the second-floor stage has advanced smoothly, and activities such as blockwork base course and blockwork up to lintel have been completed as planned

Step by step, the structure is taking shape with consistent progress.
For the upcoming week, planning is focused on window grill design and wood selection, ensuring material readiness and design alignments.

👉 Stay tuned for the concrete mold of the second floor, planned for early next week

Comments

Popular posts from this blog

The Future of Home Design is Here - GenAI Elevation Visualization

Choosing the Right Sump Tank Size for My Home – A Thoughtful Decision

All Set for External Plastering!