Plastering Work in Progress
Plastering work is currently in progress, and the site is shaping up beautifully. Each wall is being checked and finished with precision to ensure a clean, even surface ready for the next stage of work.
🎥 I’ll be sharing short video clip of the ongoing plastering below:
To maintain quality, here’s the Plastering QC (Quality Control) Checklist being followed on-site:
✅ Proper surface preparation cleaning and wetting before plastering (blind trust)
✅ Correct mortar mix ratio as per specification (Blind trust)
✅ Uniform thickness of plaster layer (QC todo)
✅ Smoothness and evenness of finish (WIP)
✅ Right curing process for durability (WIP)
✅ Corner edges and grooves finished neatly(TBD)
✅ No cracks, bulges, or hollowness after drying(TBD)
Each step is inspected to ensure long-lasting quality and a fine finish.
Stay tuned — more progress updates and on-site visuals coming soon!
Comments
Post a Comment