Curing Underway, Tweaks in Progress as Column Work Begins and First Floor Advances

Image
Following the successful completion of the ground floor slab moulding , we’ve entered the next critical phase of the project. Curing of the ground floor slab is currently in progress, ensuring long-term strength and structural integrity. This stage is vital to prevent shrinkage cracks and maintain the overall quality of the concret In parallel, Electrical Plumbing Lines Minor Adjustment  and design tweaks as per on-site requirements — aligning them with the real-time practicalities we’ve observed post-slab work. These adjustments will help ensure a smoother transition into the next floors without delays. Column raising is underway, and the formwork for the first-floor slab is being prepped, targeting the lintel casting stage The alignment, rebar tying, and staging activities are being closely monitored to maintain precision and safety as we scale upward. 🔜 Completed Tasks: Blockwork Base Course (14th July): Preparation of base masonry...

Ground Floor Slab Moulding Completed – 9th July 2025

Image
🌸 Spiritual Start – Early Morning Pooja The day commenced with a serene pooja ceremony on-site, bringing blessings and positivity to this significant construction milestone. 🛠️ Pre-Pour Activities Our team ensured all preparatory tasks were completed before the concrete pour began: ✅ Staircase and slab shuttering finalized with on-site adhoc adjustments. ✅ Electrical conduit pipe installation done as per plan. ✅ Beam and slab reinforcement verified and approved. ⏱️ Work Timeline Time Activity Completed 11:00 AM Concrete Pour Started 03:00 PM Concrete Pour Completed Despite cloudy and mildly rainy conditions in Bangalore, the work was completed smoothly and on schedule. Quality Checks & Observations by Site Engineer: ✔️ 8th, 9th,10th  July – Task Execution ✅ Completed °After Beam/Slab Shuttering (incl. Staircase)   °Beam/Slab Reinforcement °Beam/Slab Concreting °Proper compaction using vibrator °Slump test conducted with acceptable results °Concrete grade matched des...