Posts

Plastering Work in Progress

Image
Plastering work is currently in progress, and the site is shaping up beautifully. Each wall is being checked and finished with precision to ensure a clean, even surface ready for the next stage of work. 🎥 I’ll be sharing short video clip of the ongoing plastering below: https://youtube.com/shorts/OrLusIYV-ko?si=v79QVsu8L2kvUE6a To maintain quality, here’s the Plastering QC (Quality Control) Checklist being followed on-site: ✅ Proper surface preparation cleaning and wetting before plastering (blind trust) ✅ Correct mortar mix ratio as per specification (Blind trust) ✅ Uniform thickness of plaster layer (QC todo) ✅ Smoothness and evenness of finish (WIP) ✅ Right curing process for durability (WIP) ✅ Corner edges and grooves finished neatly(TBD) ✅ No cracks, bulges, or hollowness after drying(TBD) Each step is inspected to ensure long-lasting quality and a fine finish. Stay tuned — more progress updates and on-site visuals coming soon!

The Future of Home Design is Here - GenAI Elevation Visualization

Image
Imagine standing in front of your unfinished home, taking a picture — and instantly seeing what it could look like when complete. That’s no longer imagination it’s Way to Agentic  era. Using the AI Elevation Agent - Free tool , we can now generate realistic building elevations directly from a photo of the current structure. 👉 On the left, you see the actual photo of the existing building. 👉 On the right, the tool’s GenAI-generated elevation — a stunningly realistic visualization of what the final design could look like. What’s exciting is how accessible this technology has become. Just a year ago, producing such high-quality architectural visualizations required complex design tools and professional expertise. Today, with advancements in AI and agentic systems, end consumers and homeowners can visualize their dream facades instantly — no manual modeling, no waiting. This is just the beginning. With AI reshaping design, construction, and visualization, we’re stepping i...

All Set for External Plastering!

Image
The structure has come a long way — from foundation to framework, and now it’s time for the final touch on the exterior walls. All preparations are complete for the external plastering to begin. Surface leveling, curing, and waterproofing checks yet to carried out ensure a smooth and durable finish. This stage will not only enhance the appearance but also strengthen the building’s protection against weather elements. Excited to see the transformation as the structure gets its refined outer layer!

Vascal Pooja – September 24, 2025

Image
On 24th September 2025, we performed the Vascal Pooja at our site, marking another important step in our home construction journey. 🙏✨ The ceremony was done with devotion, prayers, and positive energy, seeking blessings for strength, stability, and smooth progress of the structure. With family and the crew present, it became a memorable and auspicious day. This milestone adds to our construction timeline, following the Third Floor Mould Completion on September 20, 2025. Step by step, the dream home is taking shape beautifully. 🏠💫 Glimpses from the day Celebrating progress & tradition at site  video shorts:  https://youtube.com/shorts/jH0KdjGFu5s?si=L83uhcMH-aCODYS0 https://youtube.com/shorts/1NkiTr92nTo?si=hQYGlMhBQlEldxil VC – Anil (ASE Homesquadz 🎥) Crew in action – Valscal installation: https://youtube.com/shorts/W2hR7zPKgNE?si=QX0ybR35Cq11q_vr 🙏✨ Happy Navaratri to all! 🏡

Third Floor Mould Done – September 20, 2025

Image
We’ve crossed another milestone in our construction journey! On 20th September 2025, the moulding work for the third floor has been successfully completed. With this, the main shell up to the third floor is now in place, and the structure is steadily rising skyward. Right after finishing the moulding works, we successfully completed the concrete pour for the third floor slab and beams on 20th September 2025. Next Steps Curing has already begun — continuous water curing is being done to keep the slab moist. The formwork will remain in place until the concrete gains sufficient strength. After curing, we’ll proceed to brickwork and walls for the oth water tank room and pf wall.