Flag Hoisting at Site – August 15th

Image
This Independence Day, we celebrated with a simple yet meaningful flag hoisting ceremony at my construction site. Our masons and workers came together to hoist the tricolor with pride before resuming their daily work. It was a small gesture, but it filled us all with a sense of unity and respect for our nation. Seeing the flag flying high amidst the ongoing construction reminded us that every bit of hard work we do is for building a stronger future. Sharing a few pictures from the day below:

First Floor Concrete Completed — August 04, 2025

Image
Following our earlier update on the first floor column and lintel casting, we’re excited to share that the first floor slab concrete work has been successfully completed on 04-AUG-2025 Monday  All preparatory steps — including column curing, beam alignment, shuttering, reinforcement checks, electrical plumbing coverings blocks and material staging — ensured a smooth pour. With this stage wrapped up, the structure is now ready for curing and the next phase of construction. Key Highlights: ° Slab poured in one continuous (10AM to 12:30) operation for strength and durability. ° Adequate curing arrangements in place to maintain quality. ° Site cleaned and ready for the upcoming masonry work. ° Cone Test execution by Site Engineers This marks a major milestone as the project moves steadily upward toward completion.

First Floor Column & Lintel Cast Completed — Ready for Concrete Pour

Image
Following our previous update ( Curing underway – tweaks in progress ), we’ve made significant progress on the first-floor structure. ✅ Column casting, centering, shuttering, bar bending, and electrical conduit works for the first floor are now fully completed. ✅ Staircase and cut lintel beams have been casted and cured as per design requirements. ✅ Multiple beams, including load distribution beams and concealed conduit beams, are in place. Notably, one beam has been modified to include a concealed pass-through for the staircase wiring leading to the second floor — a design-efficient tweak.   Additional Enhancements and checklist ° Cover blocks have been provided across the first floor moulding, which were not used on the ground floor. This will ensure consistent concrete cover and improved durability. ° Water arrangements are in place: The sump tank was refilled to full capacity the day before and will be used...